dien thoai di dong , dau gia , the gioi smartphone , download game mobile , smartphone , tang truong , khoa hoc cong nghe thong cong , mua ban sim , Smartphone gia re , cong nghe tuong lai , cong nghe 360 , giai tri guongmat.org , su kien trong ngay , thoi trang hi tech , thong tin 360 , may tinh bang , perfect body , kasuman.com , gia vang hom nay , tin tuc an toan , kinh te viet nam , xay dung viet nam , thoi trang , thoi trang , phu nu viet nam , tin tuc moi online , dich vu bao ve viet nam , bao ve viet nam , cong ty bao ve viet nam , tin tuc moi online , giai tri 24h , tin tuc 24h

TBG housing

  • Current Developments: Residential
    • REFURBISHMENT RESIDENTIAL DEVELOPMENT – (Member project managed the development) – Refurbishment of 351 units, consisting of 1 bed and 2 bed units, over 3 phases and all associated common area’s. Project being a three floor walk-up development with on grade parking, Construction of new guard house, parking area’s, stores and astro turf. Installation of new security system including turnstiles, biometrics, CCTV, and access control.
    • NEW RESIDENTIAL DEVELOPMENT- (project managed of the development) – 152 units , consisting of studio, 1 bed and 2 bed units. Project being a three floor walk-up development with on grade parking. Construction of new residential units, guard house, parking area’s, stores and common area’s. Functions included all town planning, designing and construction.
    • NEW RESIDENTIAL DEVELOPMENT – (Development  Management) (Member project managed the development) – 32 units , consisting of studio, 1 bed and 2 bed units, Four floor walk-up, Sectional title scheme in a secured complex. All viabilities and town planning  approvals obtained. Currently under construction.
    • NEW RESIDENTIAL DEVELOPMENT – (Development  Management) (Member project managed the development) – 50 units , consisting of studio, 1 bed and 2 bed units. Four floor walk-up, Sectional title scheme. Secured complex. All viabilities and town planning  approvals obtained. Currently under design.
    • NEW RESIDENTIAL DEVELOPMENT – (Development  Management) (Member project managed the development) – 30 units , consisting of studio, 1 bed and 2 bed units. Four floor walk-up, Sectional title scheme. Secured complex. All viabilities and town planning  approvals obtained. Currently under design.
    • NEW RESIDENTIAL DEVELOPMENT – (Development  Management) (Project managed the development) – 90 units , consisting of studio, 1 bed and 2 bed units, over 2 phases. Three floor walk-up, basement parking. All viabilities and town planning  approvals obtained. Currently under design.
  • Previous Projects: Residential
    • NEW BUILD RESIDENTIAL – DUNWEST PLACE – R7M – (Managed by Member for another Developer) – 8 units , consisting of 2 and 3 bed units with separate bath, kitchen & lounge. Single floor units were constructed. Secured garage parking in a secured complex. Development and Project Management undertaken.
    • NEW BUILD RESIDENTIAL – DUNFERN CLOSE – R11M – (Managed by Member for another Developer) -  8 units , consisting of 3 and 4 bed units with separate bath, kitchen & lounge. Two floor walk-up options were constructed. Secured garage parking in a secured complex. Development and Project Management undertaken.
  • Previous Projects: Residential
    • NEW BUILD RESIDENTIAL – SOHO MELROSE – R28M -(Managed by Member for another Developer) – 24 units , consisting of 2 and 3 bed units with separate bath, kitchen & lounge. Two floor walk-up options were constructed with Private Garden. Secured complex with guard house. Member undertook Project Management.
    • NEW BUILD RESIDENTIAL – HLANGANANI GARDENS RESIDENTIAL, COSMO CITY – R85 M -(Managed by Member for appointed project management firm) – 281 units , consisting of 1, 2 and 3 bed units with 1 bath, kitchen, lounge & dining. Three floor walk-up options available. Rental stock scheme. Secured complex. All town planning and infrastructure  works have been  designed and undertaken. All top structure works have been undertaken.
    • NEW BUILD RESIDENTIAL – LILLIANTON – R350M – (Managed by Member for appointed project management firm) – 1092 units , consisting of 1, 2 and 3 bed units with 1 bath, kitchen, lounge & dining. Three floor walk-up options available. Sectional title scheme in Secured complex. All town planning and infrastructure  works to be designed and undertaken. All top structure works to be undertaken. All viabilities and town planning  approvals obtained. Currently being taken to the market.

RECENT NEWS